FTC GRP PANEL TYPE WATER STORAGE TANKS - LARGE TANK ASSEMBLY

STEP-BY-STEP ASSEMBLY
 
TANKS FROM 1 TO 10,000M3 (260 – 2,500,000 USG)
 
Despite its’ great strength, GRP is lightweight – just 1/3 one third the weight of an equivalent  steel panel. All panels can be lifted by hand, with no special equipment required even where access is difficult, and installation can progress quickly and efficiently.

Step 1. Install steel footings on leveled concrete foundations.
Step 2. Align GRP panels to be pre-assembled.
Step 3. Place rubber sealant from ready-to-use roll between panels..
Step 4. Connect panels with bolts and nuts.
Step 5. Position bottom panel sections, and finish up base of tank.
Step 6. Position three sides of the tank.
Step 7. Position and fix roof panels and if required, roof support pipes and plates.
Step 8. Install reinforcement if required.
Step 9. Close up the tank with the fourth side.
Step 10. Finish the internal or external reinforcement.
Step 11. Fill and test.

1999 - 2008 Fiber Technology Corporation, Inc. VA, USA